In a New year gift for residents, traffic starts plying from Pakhowal Road Rail Under Bridge (RuB)

ASHU
ਸ਼ਹਿਰ ਵਾਸੀਆਂ ਲਈ ਨਵੇਂ ਸਾਲ ਦੇ ਤੋਹਫੇ ਵਜੋਂ, ਪੱਖੋਵਾਲ ਰੋਡ ਰੇਲ ਅੰਡਰ ਬ੍ਰਿਜ (ਆਰ.ਯੂ.ਬੀ.) ਤੋਂ ਆਵਾਜਾਈ ਸ਼ੁਰੂ
Project to prove very beneficial for area residents: Bharat Bhushan Ashu
Also congratulates residents on New Year

Ludhiana, January 1 2021

In a New year gift for the residents, traffic has started plying from Pakhowal Road Rail Under Bridge (RuB) from today onwards. Punjab Food, Civil Supplies & Consumer Affairs Minister Bharat Bhushan Ashu today opened the Pakhowal Road RuB-2 for trial run for vehicular traffic.

READ MORE :-Will maintain peace and brotherhood in Punjab at all costs: Arvind Kejriwal

He was also accompanied by Mayor Balkar Singh Sandhu, Senior Deputy Mayor Sham Sunder Malhotra, LIT Chairman Raman Balasubramaniam, MC Councillor Mamta Ashu, MC Commissioner Pardeep Kumar Sabharwal and other senior officials.

It is pertinent to mention that the Pakhowal Road RUB-2 would be used by vehicular traffic coming along the Sidhwan Canal and going towards Sarabha Nagar (near Skating rink).

The construction of a Rail Over Bridge (ROB) and two Rail Under Bridges (RUB’s) on Pakhowal Road has been a long pending demand of the city residents. This joint project is worth around Rs 123 crore and would provide much-needed respite from traffic congestion to the city residents.

He informed that the ROB would be 960 meters in length and would be constructed from Sidhwan Canal side towards Hero Bakery side, along Pakhowal Road over existing Railway Track, the RUB 1 would be 527 metres in length (from Hero Bakery side towards Sidhwan Canal side, along Pakhowal Road under existing Railway Track), whereas the RUB 2 would be 656 metres in length.

While speaking to mediapersons on the occasion, Bharat Bhushan Ashu said that the RuB-2 has been opened for dry run today, and within next few days, when all the works are completed, it would be opened for vehicular traffic. He assured that all ongoing development projects in Ludhiana (West) constituency are going on in full swing and would be completed in set time frame.

Ashu said that this project would prove beneficial for area residents who currently suffer due to traffic congestion on Pakhowal Road.

He also congratulated the residents on New Year.

Spread the love